Tenant Legal Guide · London 2026

Office dilapidations:
a tenant's guide

The definitive guide for commercial tenants. Section 18, the Dilapidations Protocol, cost guidance and exactly how to reduce your liability before the landlord's schedule arrives. Need the works done? See our office dilapidations service →

July 2026 10 min read 3COL Maintenance Services
Commercial office space undergoing dilapidations survey in London
FREE 3COL site visit and fixed-price quotation for schedule works
56 DAYS Usual time to respond under the Dilapidations Protocol
S.18 The legal cap - your strongest tenant defence

Sources: Dilapidations Pre-Action Protocol (Civil Procedure Rules) · Landlord and Tenant Act 1927 s.18

Definition

Dilapidations are breaches of the repairing, decorating, and reinstatement obligations in a commercial lease. At lease end, a landlord can claim the cost of remedying those breaches from the outgoing tenant. The claim is governed by the Landlord and Tenant Act 1927 (Section 18), the Dilapidations Pre-Action Protocol (Civil Procedure Rules), and the Law of Property Act 1925. A claim can run to a significant sum - making this one of the most significant financial risks commercial tenants face at lease end.

Dilapidations disputes are among the most financially damaging events in a commercial tenancy. A poorly prepared tenant can face a large claim for premises they vacated months ago. A well-prepared tenant - with documented maintenance records, a realistic Section 18 argument, and repair works completed in advance - can reduce or eliminate that liability entirely.

The legal framework

Section 18, Landlord and Tenant Act 1927

Section 18 is the most important legal protection available to commercial tenants in a dilapidations dispute. It imposes two caps on a landlord's claim. First, the landlord cannot recover more than the diminution in freehold value caused by the disrepair - meaning if the property's market value has not actually fallen, the claim is worth nothing. Second, a tenant has a complete defence where the landlord intends to demolish or structurally alter the property in ways that would have rendered the tenant's repairs pointless. This second limb is the supersession defence.

The Dilapidations Pre-Action Protocol

Part of the Civil Procedure Rules, the Protocol sets out the conduct courts expect before a claim is issued; RICS publishes separate professional guidance for surveyors. It requires the landlord to serve a Schedule of Dilapidations with costings, and the tenant to respond, usually within 56 days. Both parties must then attempt to settle before litigation. Failure to follow the Protocol can result in cost sanctions even if you win.

Leasehold Property (Repairs) Act 1938

This Act protects tenants with more than three years remaining on their lease from landlords pursuing mid-tenancy repair claims without court leave. Primarily relevant to Interim Schedules served during the tenancy, not at lease end.

How a claim works

1

Landlord's surveyor inspects the property

Typically at lease expiry or shortly after. The surveyor works through the lease covenants systematically - comparing actual condition against what the lease required.

2

Schedule of Dilapidations served on the tenant

Every alleged breach listed - cracked plasterwork, damaged flooring, unreinstated partitioning, missed redecoration cycles - with remediation costs at current London contractor rates.

3

Tenant's surveyor responds within 56 days

Each item accepted, disputed (wrong specification, already completed, supersession argument) or countered with lower cost estimates. This response is the most important document in the process.

4

Section 18 Diminution Valuation (if applicable)

If the claim is substantial and the property has been refurbished or redeveloped, the tenant's surveyor instructs a valuer to establish the Section 18 cap. Where it applies, this can reduce the claim significantly.

5

Without-prejudice negotiation between surveyors

The Dilapidations Protocol expects the parties to try to settle before going to court. Most disputes settle at this stage.

6

Settlement or litigation

Settlement by cash payment or agreed works schedule. Unresolved matters proceed to the Technology and Construction Court (TCC) or County Court.

What does it cost?

There is no reliable "average" dilapidations cost: every claim depends on the lease wording and the state of the premises. These are the factors that drive the figure. For the works themselves, 3COL's published rates are shown further down this page, and every schedule is priced on a fixed quotation after a free site visit.

Cost driver Why it matters
Unreinstated alterations Partitioning, raised floors, suspended ceilings, cabling and kitchen pods - removal and make-good is often the largest item on a schedule.
Decoration Whether the lease requires redecoration in the final year, and the specification and colours it requires.
Condition and maintenance history A building with documented maintenance and repairs done in good time has fewer items to claim.
Size and specification of the premises Larger floors and higher-specification fit-outs mean more work to reinstate.
Section 18 and supersession If the landlord plans to refurbish or redevelop, parts of the claim may be worth little or nothing.

A landlord's schedule is a claim, not what a tenant will necessarily pay. A well-prepared Section 18 argument and negotiation under the Protocol can reduce it, and works carried out before the lease ends can take items off the schedule altogether.

The 5 most common claims

🏗️

Unreinstated Alterations

Partitioning, raised floors, suspended ceilings, cabling, kitchen pods - removal and make-good is the single largest item on most London schedules.

🎨

Internal Decoration

Most leases require redecoration in the final year. Missed decoration cycles and non-standard colours are among the most common items on a schedule.

🪟

Flooring Damage

Carpet, LVT, and concrete screed damage from use, furniture, and fit-out works. Landlords often claim full replacement - this is a key negotiation point. The test is repair vs. replace.

🏛️

Ceiling & Wall Repairs

Holes, staining, water damage, cracked plaster. Listed buildings and period conversions in EC1, WC1, and Chelsea carry premium costs for ornamental plasterwork.

⚡

M&E Systems

HVAC not serviced, electrical boards not updated, pipework not maintained. This generates the most disputed items - lease commencement condition is critical evidence.

🚪

Fixtures & Fittings

Damaged doors, handles, ironmongery, and window mechanisms. Often overlooked by tenants during occupation, these items appear routinely in landlord schedules.

How to reduce your liability

Commission an Independent Condition Survey Early

Engage a Building Surveyor 18-24 months before lease expiry. An independent Condition Survey gives you an objective view of the gap between current state and lease obligations - and time to address it at your pace, with your contractors, at competitive rates. Emergency remediation in the final weeks of a tenancy, at peak contractor availability, costs two to three times more than planned works.

Carry Out Works Proactively - Don't Wait for the Schedule

If you complete required repairs, redecoration, and reinstatement to a satisfactory standard before handing back keys, the landlord has no actionable claim for those items. A professional contractor who understands lease covenants can work systematically through your obligations, producing before-and-after photographic documentation that withstands surveyor scrutiny.

3COL carries out dilapidations programmes for commercial tenants across Central London - EC1, W1, SW1, E14, SE1 - with fixed-price quotations and complete documentation.

Investigate Section 18 and Supersession

If the landlord intends any significant works after your lease ends - refit, refurbishment, demolition - a portion or all of their claim may be extinguished. Check planning applications. Ask about post-lease use. Section 18 and supersession arguments are worth exploring even when they seem unlikely - the potential reduction is substantial.

✓
18-24 months out: Commission independent Condition Survey to identify gap vs. lease obligations
✓
12-18 months out: Commission repairs, redecoration, and reinstatement at planned rates - before emergency pricing kicks in
✓
Throughout lease: Maintain a repair log with dated photographs and contractor invoices for every job
✓
When served a Schedule: Appoint a Building Surveyor immediately - the Protocol usually expects a response within 56 days
✓
Challenge specification: The lease requires "good and substantial repair" - not new-build standard. Dispute every over-specified item
✓
Section 18 valuation: If the landlord is refurbishing, commission a diminution valuation - could reduce or extinguish the claim entirely
✓
At lease end: Ensure your contractor provides before-and-after photographic documentation for all completed works

Office vs retail dilapidations

Office leases in Central London (EC1, W1, SW1, E14) focus on internal condition, M&E systems, and reinstatement of alterations. Retail leases - particularly on high streets in Chelsea (SW3), Kensington (W8), or Mayfair (W1) - carry additional obligations: shop-front maintenance, signage removal, external decoration, and sometimes specific fit-out reinstatement where the landlord contributed to the original fit-out.

Retail dilapidations in prime London locations are typically higher per sqft than equivalent office claims, because original fit-out specification is higher and reinstatement requirements are more specific. If your retail premises has an Alterations Licence, read it carefully - the exact scope of reinstatement should be specified there.

For tenants of commercial office space in London, the most effective mitigation strategy is systematic repair and redecoration in the 12-18 months before expiry, combined with a clear reinstatement plan for alterations. 3COL provides fixed-price dilapidations programmes for office premises across our core Central London postcodes, with other areas on request.

Common questions

What are dilapidations in a commercial lease?
Dilapidations are breaches of the repairing, decorating, and reinstatement covenants in a commercial lease. At the end of a lease, a landlord can serve a Schedule of Dilapidations on the outgoing tenant claiming the cost of remedying those breaches - repairs not carried out, alterations not reinstated, and redecoration not completed. The claim is governed by the Landlord and Tenant Act 1927 (Section 18), the Law of Property Act 1925, and the Dilapidations Pre-Action Protocol (Civil Procedure Rules).
What is Section 18 of the Landlord and Tenant Act 1927?
Section 18 caps a landlord's dilapidations claim at the diminution in market value of the property caused by the disrepair. If the landlord intends to redevelop or refurbish after the lease ends, any works the tenant would have carried out are "superseded" - making that portion of the claim worth nothing. Section 18 is the most powerful legal defence available to commercial tenants in dilapidations disputes.
How much do dilapidations cost in London?
It depends on the lease and the condition of the premises, so there is no reliable average figure. The main drivers are unreinstated alterations, decoration obligations, the state of repair and the size and specification of the space. Section 18 of the Landlord and Tenant Act 1927 caps damages for disrepair at the loss in value of the landlord's interest. For the works themselves, 3COL charges published rates (from £38/hr for decoration and £42/hr for general reinstatement) and prices each schedule on a fixed quotation after a free site visit.
What is a Schedule of Dilapidations?
A Schedule of Dilapidations lists every alleged breach of the lease's repairing and decorating covenants, with an estimated remediation cost for each item. The tenant's surveyor responds to each item - accepting, disputing, or countering - usually within 56 days under the Dilapidations Pre-Action Protocol. Most disputes settle through surveyor negotiation without reaching court.
What is supersession in dilapidations?
Supersession occurs when the landlord's intended works to the property would have rendered the tenant's repair obligations pointless. If the landlord is going to demolish or substantially refurbish the building, the tenant cannot be required to repair those elements - because the repairs would be immediately overridden. Supersession can significantly reduce or eliminate a dilapidations claim and is established via Section 18 valuation evidence.
When should a commercial tenant start preparing for dilapidations?
Commercial tenants in London should begin dilapidations planning at least 18-24 months before lease expiry. This allows time to commission an independent Condition Survey, carry out pre-planned maintenance and redecoration at competitive rates, and build a documented maintenance record. Starting within 3 months of lease end is too late - landlords claim at emergency contractor rates and tenants have little time to negotiate.
Can a tenant carry out dilapidations works themselves before leaving?
Yes - and it is almost always cheaper than paying the landlord's claim. If a tenant completes required repairs, redecoration, and reinstatement to a satisfactory standard before handing back keys, the landlord has no actionable claim for those items. Using a contractor who understands lease covenants and provides photographic documentation is essential.
What does reinstatement mean in a commercial lease?
Reinstatement means restoring the property to the condition it was in at lease commencement - removing any alterations (partitioning, raised floors, suspended ceilings, cabling, kitchen installations) and making good the structure underneath. Most commercial leases in London require reinstatement of approved alterations at lease end. Failure to reinstate is one of the most common sources of high-value dilapidations claims.
What is a Terminal Schedule of Dilapidations?
A Terminal Schedule is served during the last 3 years of a lease, listing items the landlord wants remedied before lease expiry. An Interim Schedule may be served earlier in the tenancy. A Final Schedule is served after lease expiry and forms the basis of the financial claim. If you receive a Terminal Schedule, engage a Building Surveyor immediately - you still have time to carry out works at competitive rates.
What is the Dilapidations Protocol?
The Dilapidations Pre-Action Protocol, part of the Civil Procedure Rules in England and Wales, sets out the conduct courts expect from landlords and tenants before a dilapidations claim goes to court. It requires the landlord to serve a detailed Schedule with supporting evidence, the tenant to respond usually within 56 days, and both surveyors to attempt settlement before litigation. Failure to follow the Protocol can result in adverse cost orders - even for the winning party.

Start here

Request a free site visit

Free site visit, then a written quotation. Very large jobs can take longer to quote.

07427 135911

Mon–Fri 7am–8pm · Sat–Sun 8am–6pm

Your request

This is a request, not a booking. We'll confirm the visit with you.

Urgent? Calling is faster than this form: 07427 135911

Call 07427 135911Request a visit