Full RAMS documentation for 3COL Maintenance Services Ltd - prepared in accordance with HASWA 1974 and all applicable UK legislation. Free download, no registration.
Download Full RAMS Free - No registration requiredA comprehensive Safe System of Work for all commercial property maintenance operations in Central London.
Full compliance with all applicable UK health & safety legislation.
| Legislation | Application to 3COL Operations |
|---|---|
| HASWA 1974 | General duty on employer. Director designated as responsible person for all operations. |
| Management of H&S Regs 1999 | Suitable and sufficient risk assessments for all activities. Competent persons appointed. |
| Work at Height Regs 2005 | PASMA-compliant scaffolding towers. Hierarchy of control strictly observed. Operatives certified. |
| COSHH 2002 | All substances assessed before use. Appropriate PPE provided. COSHH awareness training. |
| Control of Asbestos 2012 | Asbestos Awareness Cat A. Asbestos register checked. Work ceases if ACMs suspected. |
| Electricity at Work 1989 | Like-for-like only. GS38 voltage indicator. Circuit isolation and lock-off mandatory. |
| Manual Handling 1992 | TILEO framework. Two-person lift over 25kg. Mechanical aids used where available. |
| RIDDOR 2013 | All reportable incidents recorded and notified to HSE. Incident log maintained. |
| Environmental Protection Act 1990 | EA Waste Carrier CBDL628634. Waste Transfer Notes retained 2+ years minimum. |
Every risk controlled - all residual risks rated LOW after controls applied.
Every operative follows this Safe System of Work on every job, every time.
Review scope, asbestos register, building age. Confirm tools PAT tested. PPE serviceable and on-site.
Visual inspection and photographic record. Identify CU, stop-cock, gas valve. Toolbox talk delivered.
PASMA tower per BS EN 1004. Outriggers deployed. Guardrails fitted. Inspection checklist completed.
Plumbing: isolate, drain, test. Electrical: lock-off, prove dead (GS38). Carpentry: detect services first.
All waste segregated, labelled, sealed. Loaded to van. Transported to licensed facility. WTN issued.
Isolation points restored. Joint inspection with client. Photo evidence taken. Job sheet signed.
Everything your Property Manager, Facilities Manager or landlord needs - one document, free, immediate.
Full Risk Assessment (9 hazards), Method Statement (6 phases), Legal Compliance Framework (9 statutes), and PPE Schedule. Prepared in accordance with HASWA 1974. Classification: Controlled Document.
Download Full RAMS Document Zoho WorkDrive - Free - No registration