3COL-RAMS-2026-001 Version 2.0 - March 2026

RISK ASSESSMENT
& METHOD
STATEMENT.

Full RAMS documentation for 3COL Maintenance Services Ltd - prepared in accordance with HASWA 1974 and all applicable UK legislation. Free download, no registration.

Download Full RAMS Free - No registration required
HASWA 1974 Compliant
Version 2.0 - 2026
£5M Public Liability
Enhanced DBS
EA Licence CBDL628634
Document Overview

What this RAMS covers.

A comprehensive Safe System of Work for all commercial property maintenance operations in Central London.

SECTION 01
Risk Assessment Table
Nine identified hazards assessed using a 3-3 matrix. Falls from height, electrocution, asbestos, manual handling, tool security, kerbside unloading, slips/trips, dust & respiratory, and HAVS. All residual risks rated LOW.
SECTION 02
Method Statement - Safe System of Work
Step-by-step Safe System of Work covering pre-arrival planning, site arrival, work at height, execution of works (plumbing, electrical, carpentry), waste management, and site close-out.
SECTION 03
Legal Compliance Framework
Full compliance: HASWA 1974, Work at Height Regs 2005, COSHH 2002, Control of Asbestos 2012, Electricity at Work 1989, Manual Handling 1992, RIDDOR 2013, Environmental Protection Act 1990.
SECTION 04
PPE Schedule & Waste Management
Complete PPE schedule for all identified hazards. Full waste management protocol under EA Waste Carrier Licence CBDL628634 - Waste Transfer Notes retained 2+ years, disposal at licensed facilities only.
Legal Compliance

Every regulation. Documented.

Full compliance with all applicable UK health & safety legislation.

LegislationApplication to 3COL Operations
HASWA 1974General duty on employer. Director designated as responsible person for all operations.
Management of H&S Regs 1999Suitable and sufficient risk assessments for all activities. Competent persons appointed.
Work at Height Regs 2005PASMA-compliant scaffolding towers. Hierarchy of control strictly observed. Operatives certified.
COSHH 2002All substances assessed before use. Appropriate PPE provided. COSHH awareness training.
Control of Asbestos 2012Asbestos Awareness Cat A. Asbestos register checked. Work ceases if ACMs suspected.
Electricity at Work 1989Like-for-like only. GS38 voltage indicator. Circuit isolation and lock-off mandatory.
Manual Handling 1992TILEO framework. Two-person lift over 25kg. Mechanical aids used where available.
RIDDOR 2013All reportable incidents recorded and notified to HSE. Incident log maintained.
Environmental Protection Act 1990EA Waste Carrier CBDL628634. Waste Transfer Notes retained 2+ years minimum.
Risk Assessment

9 hazards identified. All LOW.

Every risk controlled - all residual risks rated LOW after controls applied.

Initial: HIGH
Falls from Height
Scaffolding & ladders up to 8m. PASMA tower, outriggers, exclusion zones.
Residual: LOW
Initial: HIGH
Electrocution
Circuit isolation, lock-off, GS38 voltage indicator. Like-for-like only.
Residual: LOW
Initial: HIGH
Asbestos (ACMs)
Awareness Cat A. Register checked. Work ceases if suspected. No removal.
Residual: LOW
Initial: MEDIUM
Manual Handling
TILEO framework. Two-person lift over 25kg. Mechanical aids used.
Residual: LOW
Initial: MEDIUM
Tool Security
Locked hard-shell cases. Van locked at all times. No tools in communal areas.
Residual: LOW
Initial: HIGH
Kerbside Unloading
Hi-Vis EN ISO 20471. Hazard lights. Banksman lookout in high-traffic areas.
Residual: LOW
Initial: MEDIUM
Slips, Trips & Falls
Area segregated. Dust sheets. 30-minute housekeeping checks.
Residual: LOW
Initial: MEDIUM
Dust & Respiratory
FFP3 respirators. LEV extraction. Wet cutting where practicable.
Residual: LOW
Initial: MEDIUM
Hand-Arm Vibration
Vibration values monitored. EAV 2.5 m/s- not exceeded. Trigger time recorded.
Residual: LOW
Safe System of Work

Method Statement - step by step.

Every operative follows this Safe System of Work on every job, every time.

01
Pre-Arrival Planning

Review scope, asbestos register, building age. Confirm tools PAT tested. PPE serviceable and on-site.

02
Site Arrival

Visual inspection and photographic record. Identify CU, stop-cock, gas valve. Toolbox talk delivered.

03
Work at Height

PASMA tower per BS EN 1004. Outriggers deployed. Guardrails fitted. Inspection checklist completed.

04
Execution of Works

Plumbing: isolate, drain, test. Electrical: lock-off, prove dead (GS38). Carpentry: detect services first.

05
Waste Management

All waste segregated, labelled, sealed. Loaded to van. Transported to licensed facility. WTN issued.

06
Site Close-Out

Isolation points restored. Joint inspection with client. Photo evidence taken. Job sheet signed.

Download Now - Free

Your compliance file starts here.

Everything your Property Manager, Facilities Manager or landlord needs - one document, free, immediate.

3COL Risk Assessment & Method Statement
Ref: 3COL-RAMS-2026-001 - Version 2.0
V2.0
Version
Mar 2026
Issue Date
Mar 2027
Review Date

Full Risk Assessment (9 hazards), Method Statement (6 phases), Legal Compliance Framework (9 statutes), and PPE Schedule. Prepared in accordance with HASWA 1974. Classification: Controlled Document.

Download Full RAMS Document Zoho WorkDrive - Free - No registration
£5M Public Liability
Enhanced DBS - 100% Team
EA Licence CBDL628634
RAMS 3COL-RAMS-2026-001
Companies House 15452227
6-Month Guarantee
Facilities Managers
4-hour response, full compliance pack, Net 7 invoicing.
View page
Property Managers
Same-day reports, single point of contact, full compliance.
View page
Book Free Site Visit
Zero call-out charge. Written quote within 24 hours.
Book now