Office dilapidations
contractor in London
End-of-lease office dilapidations across Central London, priced against your schedule of dilapidations. Strip-out, Cat A reinstatement, make-good repairs and full redecoration, with a free site visit and a written quotation. £5M insured. One contractor. One invoice.
Carrying out the works yourself can cost less than settling a landlord-led claim. We give you a written quotation before you commit.
Your surveyor serves the schedule. We carry out the works.
A dilapidations surveyor prices the claim — they do not do the building work. 3COL is the contractor that completes the strip-out, Cat A reinstatement and make-good against that schedule, so your landlord signs off and your liability closes.
Office dilapidations are a tenant's contractual obligation to return a leased office to its lease-specified condition at the end of the term - strip-out, Cat A reinstatement and make-good, priced line-by-line against the landlord's schedule of dilapidations.
Removal of all tenant alterations - partitions, kitchens, AV - back to landlord shell condition.
Ceilings, flooring and M&E services returned to base-build specification.
Landlord and Tenant Act 1927 caps liability at diminution in the reversion's value.
Every element of your lease-end obligation
From targeted make-good repairs to full Cat A reinstatement - we manage the complete dilapidations programme against your schedule of works.
From schedule to signed-off handover
A structured, transparent process designed to deliver a clean landlord sign-off without disputes or delays.
Your office dilapidations checklist
Tick off each obligation as you review your lease. The more items that apply, the more important it is to start early.
What are office dilapidations?
Office dilapidations are the contractual obligations placed on a commercial tenant at lease end to return the office to the condition specified in the lease - typically the original base-build condition at the date of occupation. In London, a schedule of dilapidations is served by the landlord's surveyor and sets out every item the tenant must remedy before vacating. Failure to comply results in a landlord's claim, which can significantly exceed the actual cost of the works.
The scope of office dilapidations in London typically includes: strip-out of all tenant alterations (partitions, kitchens, AV and data infrastructure), Cat A reinstatement of mechanical and electrical services to base-build layout, redecoration to landlord specification, make-good repairs to walls, floors and ceilings, deep clean, and licensed removal of all waste under the Environmental Protection Act 1990.
Why tenants should manage their own dilapidations
Many tenants make the mistake of leaving dilapidations to the landlord and receive a claim that is 30 to 50 per cent higher than the actual cost of the works. By appointing your own dilapidations contractor, you control the scope, the programme and the cost. You can negotiate disputed items with photographic evidence, complete works to a defined standard, and attend the landlord inspection with full documentation. The result is a clean handover with no retained liability.
3COL delivers office dilapidations across Central London - from small serviced offices to full office floors. Every project is priced against the schedule, delivered to a fixed programme, and closed out with a full photographic evidence pack.
Areas covered for office dilapidations
We operate across all Central London commercial districts: the City of London (EC1, EC2, EC3, EC4), Canary Wharf (E14), Westminster (SW1), Mayfair (W1), Covent Garden (WC2), Chelsea (SW3), Southbank (SE1), and surrounding areas. Our teams are experienced in managed commercial buildings - meeting access protocols, goods lift bookings, outside office hours requirements and the standards that London's landlord and surveyor community expect.
How much do office dilapidations cost in London?
There is no reliable price per square foot: two offices of the same size can differ widely depending on the fit-out to be removed, the services to reinstate and the landlord's specification. The cost is driven by the items in the schedule of dilapidations, the access and working hours the building allows, and the programme to handover. The only way to get an accurate figure is a site visit against your specific schedule of dilapidations - which 3COL provides free of charge.
Tenants who commission their own contractor can often reduce costs compared with accepting a landlord-led claim. Section 18 of the Landlord and Tenant Act 1927 can limit a landlord's recoverable damages to the diminution in the value of the landlord's reversion - a cap that must be evidenced and often bites where a building is being refurbished or redeveloped.
Office dilapidations FAQ
Need the full legal picture - Section 18, the Dilapidations Protocol, and how to reduce your liability as a tenant? Read our complete tenant's guide to commercial dilapidations in London →
How much do office dilapidations cost in London?
How long do office dilapidations take?
Should I do the work myself or let the landlord handle it?
When should I start planning dilapidations?
Do you handle the waste removal?
What areas of London do you cover?
Start here
Request a free site visit
Free site visit, then a written quotation. Very large jobs can take longer to quote.
07427 135911Mon–Fri 7am–8pm · Sat–Sun 8am–6pm
